PROJECT SUPPORT SCHEDULING

Do you have the right tools to manage Schedule Changes?

Master jobsite coordination

Identify slippages

Know your manpower needs

Allow us to be your extended arm in scheduling
WEM LLC works directly with project managers and foremen to help them see the effectiveness of their own work, Including gathering and rolling up information needed to interface and coordinate with the general contractor’s schedules and reporting requirements, WEM LLC’s extensive reporting capabilities put the right level of information in the right hands at the right time

Scheduling Support Tiers

Service Level

Initial Project Setup

  • Roadmap of the project

Basic Level

Progress Report

  • Schedule setup
  • Progress report
  • Scheduled monthly updates and reports on
  • Monthly basis (includes manpower overlays)

Intermediate Level

Performance Report

  • Schedule setup
  • Progress reports
  • Interconnection with JPAC® & SIS®
  • Data quality checks
  • Monthly review

Advanced Level

Efficiency Improvement

  • Progress reports
  • Analysis and interpretation, including recommendations
  • Optimized schedule for manpower, money, and material

WEM® Package

JPAC® and SIS®: (Software Online)

JPAC®:

Enhance your current accounting system or implement JPAC® on its own!

  • Increase Job Profitability by 30%
  • Detect Project Gains and Losses by 20% Complete
  • Get Cash Flow Positive by 50% Complete

SIS®:

Have the ability to react to project changes with increased agility and responsiveness.

  • Identify, Track, and Document Obstacles
  • Help your Team Work to their Full Potential
  • 3-day Look Ahead

Symphony at the Convention center

WEM, LLC provided scheduling support to Staff Electric on both the electrical and low voltage/technology scope of work.

Location: Milwaukee, WI
Size: $50 Million
Duration: 2 years
Labor Hours: 173,000

Keeping the schedule clear

WEM, LLC provided scheduling supported Dixie Electric, Plumbing, and Air and tracked the manpower movement on RSA Annex Phase 8

Location: Montgomery Alabama
Size: 10.6 million
Duration: 2 years
Labor hours: 75,667

Industries We Serve

HVAC

Distribution

Low Voltage

Healthcare

Electrical

Manufacturing

Service

Automotive

Plumbing

Construction

Banking

Aerospace

“I think the process went very well and the 30 min max that it took us to sit down and go over all of this will end up saving Bronco so much money and productivity on the job site. 1st procedure change, in my opinion is a VERY BIG/GOOD change and should only look to put us more in the GREEN at the end of the projects.”

Robbie Judd – Bronco electric

“…very valuable information to show areas of possible productivity and revenue loss and specific areas for improvement, which makes every trade more efficient and productive.”

Ed Hillman-field – Superintendent, Holmes Electric

“Our DCI Construction™ entry took 15 minutes and saved 1.5 hours of searching and finding information once the job is awarded.”

Nick H – Staff Electric

Get In Touch or Schedule a Demo

Ready to Get Started?

Make your Work, Manpower, and Money Visible today!